Our dedicated in-house team arrived on site as scheduled and began by removing the organic material from the existing surface. After two passes with a Koro FTM, the pitch was prepared for the installation of secondary drainage. For the site conditions, the chosen system was a Shelton trencher. Sand slits were installed at 1m centres, running laterally across the playing surface. These were backfilled using a Dakota sand spreader, first with gravel and then with sand. A total of 90 tonnes of MM40 sports-specific sand from Mansfield Sand Company was then spread across the training pitch before verti-draining, cultivation and seeding.