Hybrid Turf Sports Pitch Case Studies

As skilled hybrid turf construction experts, White Horse Contractors proudly serve independent schools and elite clubs across the UK.

Working closely with our hybrid turf partners GrassMaster Solutions, we work to make sure your team rises to the next level of sporting success.

The case studies shown below demonstrate our expertise in the construction of hybrid turf pitches.

Read more about our hybrid pitch services.
To speak with our specialist team, please contact us on 01865 736 272 or email us.

Renovated with Integrity

White Horse Contractors have returned to Watford Football Club at the end of the season to complete renovation works on the training ground and Vicarage Road stadium pitches.
  • Full renovation works on Training Ground pitches
  • Full renovations of Vicarage Road Stadium pitch
  • GrassMaster hybrid stitching on stadium pitch
  • Completed on time and on budget to clients specifications

Read the Case Study

A hybrid hat-trick for QPR's new training ground

White Horse Contractors construct three new hybrid pitches (as well as additional areas) with sports drainage, irrigation, lighting, ball stop netting and under pitch heating at the new Heston training ground for Queen’s Park Rangers.

“When I first came into the club and they were talking about what they were going to do at Heston, I said this was going to be the best system for us.” - Les Ferdinand, Director of Football, Queens Park Rangers FC

  • 3x Hybrid turf football pitch constructions
  • Bespoke drainage and irrigation works to ensure exceptional conditions
  • Working alongside live academy pitches
  • Collaborating once again with hybrid turf partners GrassMaster Solutions

Read the Case Study

Overcoming difficult conditions to deliver at the Ricoh Arena

After encountering issues with their existing hybrid pitch, Wasps Rugby turned to White Horse Contractors’ in-house experts to provide a solution. The team were able to produce a unique design and build specification for a new hybrid pitch that would overcome the challenges of the fully enclosed stadium.
  • Hybrid turf rugby pitch construction
  • Bespoke design to overcome unique agronomic issues
  • Raised pitch level to address existing shallow depth
  • Completed in just 4 weeks in time for the 2019/20 Premiership Season

Read the Case Study

First-ever hybrid pitch construction at an Independent School

"The hybrid pitches have transformed the way in which we have utilised our grass pitches this winter. The increased resilience and drainage of the new surfaces have meant that cancelling sessions due to being waterlogged is a thing of the past. - Stuart Litchfield, Director of Sport, Whitgift School

  • White Horse Contractors construct full-size rugby pitch
  • Completed project to school timescale
  • Bespoke design and installation of comprehensive sports drainage
  • Making hybrid history; this pitch is the first of it's kind within the education sector

Read the Case Study

For more information call 01865 736272 or email whc@whitehorsecontractors.co.uk